Procedure 程序 Issue 版本:1 TITLE: 出货检查 标题: Out-going Inspection DOC No. FQP-OQC01 文件编号: Pages: 1 of 1 Revision History 更改记录 Issue WRITTEN BY 编写 DATE 日期 版本 Page#Rev 页码 版次 CHANGE 更改内容 Review and Approval 審查和批准 Review Signature / Date Review Signature / Date [ X ] Originator: _____________________ [ X ] ISO Officer: _______________________ [ X ] QE: _______________________________ [ X ] QC Sup / GM: ______________________ [ X ] QC Sup / XX: ______________________ [ X ] QA Mgr&MR:_______________________ [ X ] PMC Senior Sup.:_________________ APP Signature / Date [ X ] Plant. M:________________ Checked by DCC: 文控审核: Effective date: Expiry date: 文件生效日期:________________ 文件失效日期:____________________
一、目 的 Purpose: Confidential & Proprietary Information of ZJKC
Procedure 程序
TITLE: 出货检查 标题: Out-going Inspection Issue 版本:1
DOC No. FQP-OQC01 Rev 文件编号: 版次:A Pages: 2 of 2 規定出貨檢查工作在有效受控下進行。To ensure that out-going inspection is performed under effective control. 二、適用範圍說明 Scope: 一般情況下,本公司产品终检后不再做出貨檢查:但在以下四种情況任一種出現時,必須進行出貨檢查。對于特別的部品(如尼龙用料部品)在某种情況必需做出貨檢查的,由项目部、QC部门等相關人員共同确定。Generally, no need out-going inspection after final inspection. But in any one of the following situations, out-going inspection is necessary. Related personnel in Program Dept and QC section are responsible for determining which parts need to do out-going inspection. 1. 產品庫存期超過6個月 (若FQC当月已对待出货产品进行了仓贮品质评估,可根据其《仓库 物资评估报告》QF-PW-009的结果进行,反之,则必须做出货检查)。 Stored more than 6 months (If the waiting-for-delivery product has been assessed by FQC in the same month, then FQC conduct in accordance with the result of the corresponding < Procedure 程序 TITLE: 出货检查 标题: Out-going Inspection Issue 版本:1 DOC No. FQP-OQC01 Rev 文件编号: 版次:A Pages: 3 of 3 由FQC組長安排FQC对待出貨的部品進行抽樣檢查。The leader arranges FQC inspector to perform sampling inspection for waiting- for- delivery parts. 4.3 檢查標准/Inspection Standard: 依<<产品终检程序>>FQP-FQC01 ,<< 品質檢查標准>> SQC002(此文件中說明哪些為重不良,哪些 為輕不良), 《手持产品喷涂表面检查标准及测试方法》SQC004,并參考制程檢驗中相應產品的 < Procedure 程序 TITLE: 出货检查 标题: Out-going Inspection Issue 版本:1 DOC No. FQP-OQC01 Rev 文件编号: 版次:A Pages: 4 of 4 any found nonconformity is also to be disposed in accordance with Procedure 程序 TITLE: 出货检查 标题: Out-going Inspection Issue 版本:1 DOC No. FQP-OQC01 Rev 文件编号: 版次:A Pages: 5 of 5 出貨檢驗合格時,則於該批貼上 “ 合格品” 標貼或臨時標識說明“檢驗合格,待出貨”字樣, 不合格品標識和最終檢驗標識相同。Product that pass the out-going inspection shall be stuck with a “Passed” identification label or an instant-making identification which notes “QC Passed, Pending delivery”. 4.7 記錄保管/Records keep: 《品質檢查報告》QF-QC-007《不合格品报告》QF-QC-005、《8D CAR 报告》QF-QC-022 由OQC科 保存, 《FQC檢查報告》QF-QC-032由项目品管科保存,保存期限為一年。 Procedure 程序 TITLE: 出货检查 标题: Out-going Inspection 开出<成品提出单>处理 Issue DOC No. FQP-OQC01 Rev 文件编号: 版次:A Pages: 6 of 6 附录1 / Appendix 1 FLOW CHART FOR OUT-GOING INSPECTION PMC provides S/R to shipping dept, store dept and FQC section PMC提供出货通知予船务部、货仓部、FQC Shipping dept arranges vehicle and warehouse Dept. Prepares goods 船务安排车辆、货仓备货 NG Inform FQC to perform inspection 货仓备货后通知FQC Rework 生产部返工 OK Sampling & Inspection 抽样&检查 Visual Inspection 外观检查 Dim. Inspection 尺寸检查 Cross Build(If need) 如需交叉装配 Logo Location Measurement Logo(If needed) 如需位置检测 Package Inspection 包装检查 Issue Nonconforming Report 开出《不合格品报告》 1 联 : 项目QC科Program QC section 2.联 : 注塑 Injection 3 .联: 贴于产品箱上 Stick onto carton NG Judge According To Inspection Standard 依检查标准判 定该批是否合格 OK 每卡板贴上一蓝色合格标贴.Put a blue “Acceptable” Label onto every pallet Follow Up/Corrective & Preventive Action 纠正预防措施跟进 Fill in Quality Inspection Report 填写《品质检查报告》 Deliver to customer 付运至客户 Confidential & Proprietary Information of ZJKC 因篇幅问题不能全部显示,请点此查看更多更全内容