项目编号:GD-09516-GG
缺失整改记录
Non-Conformity Record
项目名称Project: 编号Ref No:GDJL-NCR-****-0905-001 致To: 合同包号CP:004(A) 日期Date: 自From: (注Notes) This is to notice that your work is not conforming to requirements of the contract as follows. In this regard you are instructed to rectify such non-conforming works urgently and strictly in accordance with requirements of the contract. Furthermore, upon rectification of non-conforming works within time designated below, you shall return this record with description of rectification and results of inspection by Jianli and/or Initiator. Negligence to comply with Non-Conformance Record shall cause a monetary charge to compensate the deterioration of quality required by the contract and/or risks being contingent to such non-conformance works as stated below, which will be deducted from any money due to you. Note that such monetary charge shall not release responsibility you from any responsibility under the contract: 本记录旨在通知,你方承建的工程不符合如下合同要求。现指示你方,严格按照合同要求,立即对你方不合格的工程进行整改。并且,你方在以下指定的时间内完成不合格项目整改后,应在本记录单上填写你方整改内容以及监理和/或提议人的检查结果, 并将此记录单返还我方。如你方未能按本记录进行整改,则由于下述缺失项工作所造成的质量缺陷的弥补而产生的费用和/或由于下述缺失项工作所可能导致的风险而产生的费用,应由你方承担,该费用将从支付你方的应付款中扣除。但该费用的扣除不能免除你方在该合同项下的任何责任。 主题Subject 区域 Area 地点Location 缺失项Non-conformity 整改完成时间Required time to be rectified 罚款Monetary charge 提议人Initiator 代表Representative 说明 Description 备注Remarks 承包商报送Submission by the contractor: 主题Subject 整改状态 Rectified status 整改日期及时间 Rectified date & time 监理检查 Inspected by Jianli 提议人检查 Inspected by Initiator 项目经理签字Signature of Project Manager: 日期Date: 说明 Description 备注Remarks Copy to: □ BOEHF □ PM □ Design □ Contractor
因篇幅问题不能全部显示,请点此查看更多更全内容